Extension of Hernando Trail to the east. The trail will
ultimately run between Carmona, past Woodlands, to the east crossing of
Ponce de Leon Blvd
and Desoto Blvd. This would add 6 miles to the Trail and will enhance
access to the trails in the eastern sections of the village.
-
2004 plan includes construction from
Cortez Road (Good
Samaritan campus) to Minorca Rd and on toward Danville Rd.
-
2005 plan includes starting at the east end (Ponce
de Leon Blvd) and coming west toward the existing trail.
-
2006 plan is to connect the two for an 8.5 mile long
trail.
Connecting the extended Hernando Trail to the Balboa Spillway
Trail, along Ponce de Leon Blvd.
(2008)
Connecting the west end of Hernando Trail to the Desoto
Spillway Trail, making it possible to walk via trails from Desoto Dam to
Balboa Dam. (2009)
Connecting the Desoto Spillway Trail with the Desoto
Multi-purpose Trail, providing a major step in the vision of trails
crossing the Village end-to-end.
Improvements to existing trails.